Ground Floor Extension, Loft Conversion and Renovation, Cheshire

Bringing the outside in

One of our most extensive construction projects to date was designed and constructed to maximise the rear of the property with large bi-fold doors bringing the outside in with warming natural light streaming into the new kitchen area.

Build specification:

  • Kitchen supply and installation, including granite work surfaces, wall and floor tiling.
  • Four separate bathroom suites supplied and installed including tiling.
  • Construction of master bedroom balcony, including EPDM flat roof covering, and glass & Aluminium railing.
  • Supply and installation of aluminium framed windows and doors, including 2 x sets of bi-fold doors.
  • Supply and installation of new hard wood doors and ironmongery throughout.
  • Supply and installation of new open tread Oak staircase.
  • Installation of new wood burning stove.
  • Full electrical rewire.
  • Installation of new central heating system, including new boiler.
  • Installation of complete new drainage system, including new septic tank installation.
  • Installation of anti-crack, silicon based K Rend external rendering system.
  • Installation of block paved patio.

 

For further portfolio documentation on this Brittonhall Construction project, please view our company’s full portfolio on Facebook.

VIEW THIS PROJECT ON FACEBOOK